Checklist

Bathroom renovation checklist

A bathroom packs plumbing, electrical work, waterproofing and tiling into a small room, so the order of work matters. Use this checklist to plan the job, know which parts need a licensed professional, and check the result before you sign off.

21 tasks · Last checked 23 November 2026

Project overview

Most bathroom renovations follow the same path: decide the scope and budget, check whether consent is needed, choose your trades, strip out, rough in the plumbing and wiring, waterproof, line and tile, then fit off.

In New Zealand, plumbing, drainlaying, gasfitting and most electrical work legally have to be done by licensed people. Waterproofing is easy to get wrong and expensive to fix later, so leave time for it to be done properly.

Before you start

  1. A refresh (new vanity, tapware and paint) is a very different job from moving the shower, toilet or walls. Write down what stays where it is and what moves.

  2. Get prices from businesses for your actual scope, and keep money aside for surprises found behind the walls and floor.

  3. Older wall linings, vinyl flooring and adhesives can contain asbestos. Have suspect materials tested before anyone cuts, drills or removes them.

    Safety and the rules: Don't break up, sand or drill materials that might contain asbestos. Get them tested and, if asbestos is found, use a licensed removalist where the rules require one.

  4. Like-for-like replacement is treated differently from moving plumbing, changing walls or altering the structure. Your council can tell you what applies before you commit.

Planning

  1. Choose the vanity, shower, toilet, tapware, extractor fan and lighting before the trades start, so pipes and wiring go in the right place.

    Have ready: Keep a list of model numbers and the installation sheets for each fixture.

  2. An extractor fan ducted to the outside helps prevent condensation and mould. Decide where it goes and where the duct will run.

  3. Book a licensed plumber (and drainlayer if drains move) and a licensed electrician. Ask to see their licence and check it.

    Safety and the rules: Homeowners may only replace or repair taps, ball cocks and plugs and install appliances. Work on pipes, fixtures, traps and wastes has to be done by a licensed plumber.

    Source: Plumbers, Gasfitters and Drainlayers Board, Advice for consumers

  4. New circuits, heated towel rails, underfloor heating and moved lights or switches are electrical work.

    Safety and the rules: Prescribed electrical work has to be done or supervised by someone with a current practising licence.

    Source: Electrical Workers Registration Board, Prescribed electrical work

  5. If the job changes the primary structure or the weathertightness of the house (for example moving an external wall or window), it may be restricted building work.

    Safety and the rules: Restricted building work must be done or supervised by a Licensed Building Practitioner in the right class. You can check a licence on the public LBP register.

    Source: Licensed Building Practitioners scheme, Restricted building work

  6. Compare what each quote includes: strip-out, rubbish removal, waterproofing, tiling, fixtures and making good.

Preparation

  1. The room can be out of use for weeks. Plan for showering and toilet access, especially if you have only one bathroom.

  2. Clear and cover floors and doorways between the bathroom and the outside, where materials and rubbish will be carried.

  3. Have the fixtures on site, or reliably scheduled, before the strip-out so the room isn't left unusable waiting for parts.

During the work

  1. Before linings go on, check that pipes, wastes and wiring are where your fixtures need them. Take photos for future reference.

  2. Ask who is responsible for the waterproofing membrane, which product is used, and that it is applied to the maker's instructions and cured before tiling.

    Have ready: Ask for the membrane's product name and any warranty paperwork.

  3. If you have a building consent, inspections must happen at set stages. Missing one can mean opening up finished work.

  4. Hidden rot, uneven floors or a new fixture choice change the price. Get each change and its cost confirmed before the work goes ahead.

Final check

  1. Check for leaks under the vanity and around the toilet, good drainage in the shower, and hot water at each outlet.

  2. Water should run to the waste, not pool. Silicone joints should be continuous where fixtures meet walls and floors.

  3. Check that the extractor fan vents outside and that every switch, heater and light works.

  4. Keep certificates from your plumber and electrician, product warranties, and the code compliance certificate if you had a building consent.

Common questions

Can I do some of the work myself?

You can usually do work like painting, demolition of non-structural items (once asbestos is ruled out) and fitting accessories. Plumbing on pipes and fixtures and most electrical work must be done by licensed people.

Who should do the waterproofing?

Agree it in writing before work starts. It may be your builder, tiler or a specialist applicator. What matters is that one person is responsible for it and uses a system to the maker's instructions.

How long does a bathroom renovation take?

It depends on the scope, trade availability, curing times and any inspections. Ask each business for a timeline with their quote.